Questions

Q:

1993 Nobel prize for literature has gone to the first black american lady, for her work ' Beloved'. The name of the lady is

A) Carla Hill B) Robin raphel
C) Winnie D) Toni morrison
 
Answer & Explanation Answer: D) Toni morrison

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Honours and Awards

2 3247
Q:

Who was the first to sail round the world ?

A) Francis Drake B) Columbus
C) Magellan D) Vasco da Gama
 
Answer & Explanation Answer: C) Magellan

Explanation:

Magellan was a Portuguese sailor who was the first to sail round the world.

Report Error

View Answer Report Error Discuss

Filed Under: World History

1 3246
Q:

Who Built The Suez Canal?

A) Theodore Roosevelt B) Ferdinand de Lesseps
C) Robert Mills D) James Hoban
 
Answer & Explanation Answer: B) Ferdinand de Lesseps

Explanation:

The Suez Canal in Egypt, is a 101 mile long canal that connects the Mediterranean Sea with the Gulf of Suez, a northern branch of the Red Sea. It was built in 1869 by Ferdinand de Lesseps.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

6 3246
Q:

In the following question, a sentence has been given in Direct/Indirect speech. Out of the four alternatives suggested, select the one, which best express the same sentence in Indirect/Direct speech.

The coach said, "Don’t move, boys."

A) The coach told to the boys don't move. B) The coach said to the boys not to be moving.
C) The coach asked the boys not to move. D) The coach told to them, don't move boys.
 
Answer & Explanation Answer: C) The coach asked the boys not to move.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 3246
Q:

Unlike conservation, what does preservation emphasize?

A) Saving natural resources B) Managing natural resoucres
C) Carrying capacity D) Renewing natural resources
 
Answer & Explanation Answer: A) Saving natural resources

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 3245
Q:

Which statement regarding the mammalian heart is correct?

A) Blood is pumped from the heart via the atria. B) Oxygen-loaded blood moves only through the right side of the heart.
C) When the right atrium contracts, it forces blood into the left atrium. D) In the adult heart, blood in the right chambers of the heart cannot enter the left chambers without passing through the lungs.
 
Answer & Explanation Answer: D) In the adult heart, blood in the right chambers of the heart cannot enter the left chambers without passing through the lungs.

Explanation:

In the adult heart, blood in the right chambers of the heart cannot enter the left chambers without passing through the lungs is correct regarding mammalian heart.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

2 3245
Q:

How many Covalent Bonds can Nitrogen form

A) 2 B) 3
C) 4 D) 1
 
Answer & Explanation Answer: B) 3

Explanation:

Nitrogen (N2) forms Three Covalent Bonds to become stable.

 

Here the Atmomic Number of Nitrogen is 7. Because there are 2 electrons in the first orbital and 5 in the second and you still have space for 3 more. So it shares, 3 to get the stable octet. Therefore, there are 3 covalent bonds in N2.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE
Job Role: Analyst , Bank PO

8 3244
Q:

What's the role of CMM Level in Testing?

Answer

Capability Maturity Model (CMM) is a model of 5 levels of process 'maturity' that determine effectiveness in delivering quality software. The 5 levels of CMM are described as below:


Level 1: Initial: - characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully complete projects. Very few or none of the processes are in place.


Level 2: Repeatable: - Software Project Tracking, Requirements Management, Realistic Planning and Configuration Management Processes are in place; successful practices can be repeated.


Level 3: Defined: - Standard Software Development and Maintenance Processes are integrated throughout an organization. A Software Engineering Process Group is in place to oversee software processes, and training programs are used to ensure understanding and compliance.


Level 4: Managed: - Metrics are used to track productivity, processes, and products. Project performance is predictable, and quality is consistently high.


Level 5: Optimizing: - The focus is on continuous process improvement. The impact of new processes and technologies can be predicted and effectively implemented when required.


Any organization can start from any level, but its motto is to reach level 5; where the focus is continuous process improvement. By doing this, high quality s/w delivery is assured.


From this, we can see that the whole essence of CMM or CMMI is to produce quality software. It targets the whole organizational practices (or processes), which are believed to be the best across industries. Testing is part of Quality Assurance. CMM levels play an important role in an organization’s Quality Assurance effort. Thus testing plays an important role in determining CMM level.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 3244