Bank Clerk Questions


Q:

A sweet seller sells 3/5th part of sweets at a profit of 10% and remaining at a loss of 5%. If the total profit is Rs 1500, then what is the total cost price of sweets ?

A) Rs.37,500 B) Rs.36,400
C) Rs.37,415 D) Rs.36,500
 
Answer & Explanation Answer: A) Rs.37,500

Explanation:

Assume A be the cost price.

 

Therefore,
35×A×10100 - 25×A×5100 = 1500

 

=>  A = Rs 37,500.

Report Error

View Answer Report Error Discuss

Filed Under: Profit and Loss
Exam Prep: GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

30 22080
Q:

Minimum number of straight lines required to form the below figure ?

                      21484547018.png image

A) 18 B) 17
C) 14 D) 16
 
Answer & Explanation Answer: C) 14

Explanation:

The given figure can be labelled as shown :

       2-11484547091.png image

The horizontal lines are AK, BJ, CI, DH and EG i.e. 5 in number.
The vertical lines are AE, LF and KG i.e. 3 in number.
The slanting lines are LC, CF, FI, LI, EK and AG i.e. 6 in number.
Thus, there are 5 + 3 + 6 = 14 straight lines in the figure.

Report Error

View Answer Report Error Discuss

Filed Under: Analytical Reasoning
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

27 22035
Q:

P is 30% more efficient than Q. How much time will they, working together, take to complete a job which P alone could have done in 23 days?

A) 16 days B) 13 days
C) 15 days D) 12 days
 
Answer & Explanation Answer: B) 13 days

Explanation:

Ratio of times taken by P & Q = 100 : 130 = 10:13

 

Let Q takes x days to do the work

Then, 10:13 :: 23:x

=> x = 23x13/10

=> x = 299/10

 

P's 1 day's work = 1/23

Q's 1 day's work = 10/299

(P+Q)'s 1 day's work = (1/23 + 10/299) = 23/299 = 1/13

Hence, P & Q together can complete the work in 13 days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

17 22018
Q:

P and Q can complete a job in 24 days working together. P alone can complete it in 32 days. Both of them worked together for 8 days and then P left. The number of days Q will take to complete the remaining work is ?

A) 56 days B) 54 days
C) 60 days D) 64 days
 
Answer & Explanation Answer: D) 64 days

Explanation:

(P+Q)'s 1 day work = 1/24

P's 1 day work = 1/32

=> Q's 1 day work = 1/24 - 1/32 = 1/96

Work done by (P+Q) in 8 days = 8/24 = 1/3

Remainining work = 1 - 1/3 = 2/3

Time taken by Q to complete the remaining work = 2/3 x 96 = 64 days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

23 21941
Q:

Square is to Triangle and Cube is to

A) Pyramid B) Rectangle
C) Ice D) Rhombus
 
Answer & Explanation Answer: A) Pyramid

Explanation:

Square is 2-dimensional 4 sided figure Whereas Cube is 3-dimensional figure which looks like Square.

 

Similarly, Triangle is 2-dimensional 3 sided figure Whereas Pyramid is 3-dimensional figure which looks like Triangle.

Report Error

View Answer Report Error Discuss

Filed Under: Analogy
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

14 21926
Q:

It takes five minutes to pass a rumour from one person to two other persons. The tree of rumour continues. Find how many minutes does it take spread the rumour to 729 persons ?

A) 45 min B) 25 min
C) 30 min D) 36 min
 
Answer & Explanation Answer: C) 30 min

Explanation:

After 5 mins ..... 3 persons will get rumour
After 10 mins .... 3x2 + 3 = 9 = 32 persons will get
after 15 =5x3 min ......9x2 + 9 =27 = 33 persons will get news.
.
.
after 5x6 mins ... 36 = 729 persons will get news.

 

Therefore, time taken to spread the rumour to 729 persons is 30 minutes.

Report Error

View Answer Report Error Discuss

Filed Under: Arithmetical Reasoning
Exam Prep: GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

23 21924
Q:

Rain drops acquire spherical shape due to 

A) viscosity B) surface tension
C) friction D) elasticity
 
Answer & Explanation Answer: B) surface tension

Explanation:

The Surface tension pulls the surface of the drop equally at all points thus produces the spherical shape having the minimum surface area. This surface tension is the "skin" of a body of water that makes the molecules stick together.

                                 Rain_drops_acquire_spherical_shape_due_to1558074071.png image 

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

123 21920
Q:

A polygon has 44 diagonals, then the number of its sides are ?

A) 13 B) 9
C) 11 D) 7
 
Answer & Explanation Answer: C) 11

Explanation:

Let the number of sides be n. 

The number of diagonals is given by nC2 - n  

Therefore, nC2 - n = 44, n>0 

nC2 - n = 44

n- 3n - 88 = 0 

n2 -11n + 8n - 88 = 0  

n(n - 11) + 8(n - 11) = 0 

n = -8 or n = 11.

 

As n>0, n will not be -8. Therefore, n=11.

Report Error

View Answer Report Error Discuss

Filed Under: Permutations and Combinations
Exam Prep: GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

25 21817