Bank PO Questions


Q:

If a parallelogram with area p, a triangle with area R and a triangle with area T are all constructed on the same base and all have the same altitude, then

A) P=R B) P=A
C) P=A/2 D) P=2R
 
Answer & Explanation Answer: A) P=R

Explanation:

let each have base = b and height = h
then p = b*h, R = b*h and T = (1/2) * b*h
so P = R, P = 2T and T = (1/2)*R are all correct statements

Report Error

View Answer Report Error Discuss

Filed Under: Area
Exam Prep: Bank Exams
Job Role: Bank PO

2 8246
Q:

If 6 engines consume 24 metric tonnes of coal, when each is working 8 hours day, how much coal will be required for 9 engines, each running 13hours a day, it being given that 2 engines of former type consume as much as 3 engines of latter type ?

A) 45 metric tonnes B) 47 metric tonnes
C) 55 metric tonnes D) 34 metric tonnes
 
Answer & Explanation Answer: A) 45 metric tonnes

Explanation:

2 engines of former type for one hour consumes (2 x 24)/(6 x8) = 1 metric ton 

i.e. 3 engines of latter type consumes 1 ton for one hour

Hence 9 engines consumes 3 tons for one hour

For 15 hours it is 15 x 3 = 45 metric tonnes.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

3 8241
Q:

Find the length of the altitude of an equilateral triangle of side  33cm.

A) 4.5 B) 3.5
C) 2.5 D) 6.5
 
Answer & Explanation Answer: A) 4.5

Explanation:

Let the length of the altitude be h.
Then, h = a32   = 33 × 32 = 4.5

Report Error

View Answer Report Error Discuss

Filed Under: Area
Exam Prep: CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

3 8240
Q:

Porcupine : Rodent :: Mildew : ?

A) Insect B) Fungus
C) Pathogen D) Germ
 
Answer & Explanation Answer: B) Fungus

Explanation:

Porcupine is a rodent and mildew is a fungus.

Hence, Porcupine : Rodent :: Mildew : Fungus.

Report Error

View Answer Report Error Discuss

Filed Under: Analogy
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

14 8239
Q:

What is the value of 100P2 ?

A) 10000 B) 9900
C) 8900 D) 7900
 
Answer & Explanation Answer: B) 9900

Explanation:

Here in 100P2, P says that permutations and is defined as in how many ways 2 objects can be selected from 100 and can be arranged.

 

That can be done as,

 

100 P2  = 100!/(100 - 2)!

= 100 x 99 x 98!/98!

= 100 x 99 

= 9900.

Report Error

View Answer Report Error Discuss

Filed Under: Permutations and Combinations
Exam Prep: TOEFL , GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

8 8235
Q:

If 25a + 25b = 115, then what is the average of a and b?

A) 4.6 B) 3.4
C) 2.5 D) None of these
 
Answer & Explanation Answer: D) None of these

Explanation:
Report Error

View Answer Report Error Discuss

55 8221
Q:

If sum of upstream and downstream speed of a boat is 82 kmph, and the boat travels 105 km. upstream in 3 hr, Find the time taken by boat to cover 126 km downstream. 

A) 2.8 hrs B) 2.7 hrs
C) 2.6 hrs D) 2.5 hrs
 
Answer & Explanation Answer: B) 2.7 hrs

Explanation:

Let Speed of boat in still water = b

Let Speed of still water = w

Then we know that,

Speed of Upstream = U = boat - water

Speed of Downstream = D = boat + water

Given, U + D = 82

b - w + b + w = 82

2b = 82

=> b = 41 kmph

From the given data,

41 - w = 105/3 = 35

w = 6 kmph

Now,

b + w = 126/t

=> 41 + 6 = 126/t

=> t = 126/47  = 2.68 hrs.

Report Error

View Answer Report Error Discuss

Filed Under: Boats and Streams
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

21 8220
Q:

Solve the Missing Number Puzzle ?

missing_number1501485405.jpg image

Answer

The rule followed here is


7 + 3 - 4 = 6


Similarly,


4 + 2 - 2 = 4


9 + 5 - 4 = 10


Hence, the missing numbers are 4 & 10.

Report Error

View answer Workspace Report Error Discuss

Subject: Number Puzzles Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

41 8219