Q:

What is the purpose of specifying a planning horizon?

A.  Only materials manifesting a planning-relevant change within the planning horizon are taken into account in the MRP run (where NETPL is used).
B.  To specify whether forecasts are included in the material requirement calculation.

C. To specify that only externally procured (and not internally procured) items are included in the net change MRP run.

D. To specify whether a NETCH (net change in complete horizon) or a NETPL (net change in planning horizon) will take place in the next MRP run.

Answer

Answer : A

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

6 3082
Q:

What is the difference between oracle,sql and sql server?

Answer

  • Oracle is based on RDBMS.

  • SQL is Structured Query Language.

  • SQL Server is another tool for RDBMS provided by MicroSoft


 

Report Error

View answer Workspace Report Error Discuss

2 3078
Q:

Which of the following is correct?

A) Full- duplex Ethernet uses one pair of wires B) Full- duplex Ethernet uses two pairs of wires
C) Half- duplex Ethernet uses two pairs of wires D) Full- duplex Ethernet uses three pairs of wires
 
Answer & Explanation Answer: B) Full- duplex Ethernet uses two pairs of wires

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3077
Q:

What must be configured on the network in order for users on the Internet to view web pages located on Web Server 2?

A. On router R2, configure a default static route to the 192.168.10.0 network
B. On router r2, configure DNS to resolve the URL assigned to Web Server 2 to the 192.168.10.20 address
C. On router R1, configure NAT to translate an address on the 209.165.100.0/24 network to 192.168.10.20
D. On router R1, configure DHCP to assign a registered IP address on the 209.165.100.0/24 network to Web Server 2

Answer

Answer : C

Report Error

View answer Workspace Report Error Discuss

Subject: CCNA

0 3074
Q:

What is the maximum data rate for the 802.11g standard?

A) 6Mbps B) 11Mbps
C) 22Mbps D) 54Mbps
 
Answer & Explanation Answer: D) 54Mbps

Explanation:

The IEEE 802.11g standard provides a maximum data rate of up to 54Mbps.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3064
Q:

You use Microsoft Visual Studio 2010 and Microsoft .NET Framework 4 to create an application. The application uses the ADO.NET Entity Framework to model entities. The application allows users to make changes to entities while disconnected from the central data store.

 

You need to ensure that when the user connects to the central data store and retrieves new data, the application meets the following requirements:

  • Changes made to the local data store in disconnected mode are preserved.
  • Entities that have already been loaded into the local data store, but have not been modified by the user, are updated with the latest data.

What should you do?

A) Call the query's Execute method by using the MergeOptions.AppendOnly option. B) Call the query's Execute method by using the MergeOptions.OverwriteChanges option.
C) Call the Refresh method of ObjectContext by using the RefreshMode.StoreWins option. D) Call the Refresh method of ObjectContext by using the RefreshMode.ClientWins method.
 
Answer & Explanation Answer: D) Call the Refresh method of ObjectContext by using the RefreshMode.ClientWins method.

Explanation:
Report Error

View Answer Report Error Discuss

17 3062
Q:

Project Management - Introduction

What is Project Management?

Answer

Project Management is the application of Knowledge, skills, tools and techniques to project activities to meet project requirements. Project Management is accomplished through the application and integraton of the project management processes of  initiating, planning, executing, monitoring and controlling , closing.

Report Error

View answer Workspace Report Error Discuss

0 3047
Q:

How can you assign a profit center to a sales order item?

A. The profit center is taken from the customer master record.
B. The profit center can be entered manually.
C. The profit center for the material is set automatically.
D. The profit center can be set with a substitution.

Answer

Answer : B , C , D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP CO

1 3046