Certification Questions

Q:

You have installed a Windows Server 2003 DNS server, but because of security reasons, you have to install this behind a firewall. What port on the firewall must be opened so that users can access the server?

A) IP and UDP port 42 B) UDP and TCP port 53
C) TCP 53 but not UDP D) PPTP and UDP 21
 
Answer & Explanation Answer: B) UDP and TCP port 53

Explanation:
Report Error

View Answer Report Error Discuss

0 3627
Q:

An administrator issues the command

A. The PC host PC1 has connectivity with a local host
B. The PC host PC1 has connectivity with a Layer 3 device
C. The PC host PC1 has a default gateway correctly configured
D. The PC host PC1 has connectivity up to Layer 5 of the OSI model
E. The PC host PC1 has the TCP/IP protocol stack correctly installed

Answer

Answer : E


Explanation:


The “ping 127.0.0.1″ command is used to troubleshoot the local network card and the TCP/IP stack to make sure is working correctly. If an ICMP echo reply is received, that shows there are connectivity to a particular host in the network.


 

Report Error

View answer Workspace Report Error Discuss

Subject: CCNA

0 3625
Q:

The network address used to advertise a summary address is always which of the following?

A) The last network address in the block B) The next to last network in the block
C) The second network in the block D) The first network in the block
 
Answer & Explanation Answer: D) The first network in the block

Explanation:

The network address used to advertise a summary address is always the first network in the block

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3623
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3615
Q:

Which configuration command must be in effect to allow the use of 8 subnets if the Class C subnet mask is 255.255.25.224?

A) Router(config)#ip classless B) Router(config)#ip version 6
C) Router(config)#ip unnumbered D) Router(config)#ip subnet-zero
 
Answer & Explanation Answer: D) Router(config)#ip subnet-zero

Explanation:

A Class C subnet mask of 255.255.255.224 is 3 bits on and 5 bits off (11100000) and provides 8 subnets, each with 30 hosts. However, if the command ip subnet-zero is not used, then only 6 subnets would be available for use.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3615
Q:

You are a project manager for the redevelopment of the Hoover Dam. Your team has been provided with the scope statement, but it lacks many description details. Your team is concerned because the project is in the initiation phase and it wants to postpone it until it has more information. As the project manager, you recommend that

A) The team should go forward, but be caution about the lack of details and the impact upon the timeline for the project B) The project should not go forward until the stakeholders agree about the scope and purpose of the project
C) The team should verify the scope and realize that more details will be available as more project characteristics are progressively elaborated. D) The team should review the project selection criteria for the Hoover Dam project
 
Answer & Explanation Answer: C) The team should verify the scope and realize that more details will be available as more project characteristics are progressively elaborated.

Explanation:

The project details and description will usually have less detail at the beginning of the project and will increase as the characteristics are progressively elaborated. Answer A is incorrect because the team should confirm that they understand the esence of the scope of the project, even if the details might be ambiguous at the beginning of the project. Answer B is incorrect because the project should go forward; however, the team should request further clarification of what the project scope entails. Answer D is incorrect because the project selection criteria should be established before the project begins.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3613
Q:

When you run Sysprep on a Windows 2000 computer, what happens to the user-specific information on the computer?

A) It is preserved in usset.inf B) It is saved and automatically reinstalled
C) It is removed D) It is not altered
 
Answer & Explanation Answer: C) It is removed

Explanation:

The user-specific settings are removed by Sysprep.

Report Error

View Answer Report Error Discuss

0 3609
Q:

Which of the statements are true when running the dunning program

A. we can recreate the proposal until the dunning clerk is satisfied with the result

B. after completing the dunning proposal list, dunning data is updated in the master records of respective customer/ vendor

C. we cannot delete the proposal

D. we can edit proposal

Answer

Answer : A , D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP FI

2 3598