Questions

Q:

Prahaar is a-

A) surface-to-surface missile B) aircraft carrier
C) submarine D) battle tank
 
Answer & Explanation Answer: A) surface-to-surface missile

Explanation:

Prahaar is a contemporary weapon system capable of carrying multiple types of warheads & neutralizing a wide variety of targets. It is a indigenously developed surface-to-surface tactical missile by DRDO.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

8 3277
Q:

A copper wire of radius r and length lhas a resistance of R. A second copper wire with radius 2r and length lis taken and the two wires  are  joined  in  a  parallel  combination. The  resultant  resistance   of  the  parallel combination of the two wires will be

A) 5 R B) 5 R/4
C) 4 R/5 D) R/5
 
Answer & Explanation Answer: D) R/5

Explanation:

1st copper wire: R = pl/A = pl/ πr2

2ndcopper wire: R’ = p’l’/A’ = pl/(4 πr2) = R/4

If joined in parallel, (1/Req) = (1/R) + (1/R’)

= 1/R + 4/R1/Req= 5/R

Req= R/5

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

2 3277
Q:

For Distribution of powers between the Union and the States, the Constitution of India introduces three lists. Which two of the following Articles govern the distribution  of powers:

A) Articles 4 and 5 B) Articles 56 amd 57
C) Articles 141 and 142 D) Articles 245 and 246
 
Answer & Explanation Answer: D) Articles 245 and 246

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics

6 3277
Q:

Project Integration Management

What are the Project Management Processes included in the Project Integration Management?

Answer

The Integrative Project Management Processes include:


Develop Project Charter - Developing the project charter that formally authorizes a project or a project Phase.


Develope Preliminary Project Scope Statement - Developing the preliminary project scope statement that provides a high level scope narrative


Develop Project Management Plan -  Documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans into a project management plan.


Direct and Manage Project Execution- Executing the work defined in the project management plan to achieve the project's requirements defined in the project scope statement.


Monitor and Control Project Work - Monitoring and controlling the processes used to initiate, plan, execute, and close a project to meet the performance objectives defined in the project management plan.


Integrated Change Control - Reviewing all change requests, approving changes, and controlling changes to the deliverables and organizational process assets.


Close Project - Finalizing all activities across all of the Project Management Process Groups to formally close the project or a Project phase.

Report Error

View answer Workspace Report Error Discuss

0 3277
Q:

Find the compound amount if $1200 is deposited at 8% interest for 11 years if interest is compounded continuously

A) 1456 B) 1456
C) 1693.08 D) 1890
 
Answer & Explanation Answer: C) 1693.08

Explanation:

M=Pe^yr

 

2893.08

 

I=M-P

Report Error

View Answer Report Error Discuss

0 3276
Q:

What is Bandwidth?

Answer

Every line has an upper limit and a lower limit on the frequency of signals it can carry. This limited range is called the bandwidth

Report Error

View answer Workspace Report Error Discuss

Subject: Networking
Job Role: Network Engineer

1 3276
Q:

In the following question, out of the four alternatives, choose the word which is opposite in meaning to the given word and click the button corresponding to it.

SOOTHE

A)  QUENCH B) MITIGATE
C)  HEAL D) AGITATE
 
Answer & Explanation Answer: D) AGITATE

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: TOEFL , GRE , CAT

0 3275
Q:

A and B entered into a partnership with Rs.800 and Rs.1600 respectively. From 9th months onward they each decided to invest Rs.100 more on starting of each month. If total annual profit is Rs.7700 then find the profit share of A.

A) Rs.2550 B) Rs.3200
C) Rs.2650 D) Rs.2450
 
Answer & Explanation Answer: C) Rs.2650

Explanation:

A : B = (800 × 8+ 900+ 1000+ 1100+ 1200): (1600 × 8+ 1700+ 1800+ 1900+ 2000)
A : B = 53 : 101
Profit of A ⇒ 7700 ×53/154 = 2650 Rs.

Report Error

View Answer Report Error Discuss

0 3275