CAT Questions

Q:

Which component of an IED creates an electrical charge?

A) activator B) fuse
C) explosive D) power source
 
Answer & Explanation Answer: D) power source

Explanation:

The power source such as a Battery of an IED creates an electrical charge.

 

What are IED's ::

An Improvised Explosive Device (IED) is a bomb constructed and deployed in ways other than in conventional military action. It may be constructed of conventional military explosives, such as an artillery shell, attached to a detonating mechanism. IEDs are commonly used as roadside bombs.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

10 10159
Q:

Orlon is a polymer of

A) Dacron B) Acrylonitrile
C) Polyamide Nylon D) None of the above
 
Answer & Explanation Answer: B) Acrylonitrile

Explanation:

The monomeric unit of orlon polymer is Acrylonitrile. Orlon is also known as Polyacrylonitrile (PAN). 

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

19 10152
Q:

The symbols used in an assembly language are called ?

A) Assembler B) Mnemonics
C) Codes D) All of the above
 
Answer & Explanation Answer: B) Mnemonics

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Computer
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

38 10148
Q:

An Engine length 1000 m moving at 10 m/s. A bird is flying from engine to end with 'x' m/s and coming back at '2x' m/s. Take total time of bird travelling as 187.5 s. Find x and 2x in km/hr ?

A) 21.4 and 42.8 B) 25.2 and 50.4
C) 31.4208 and 62.8416 D) 33.12 and 66.24
 
Answer & Explanation Answer: C) 31.4208 and 62.8416

Explanation:

Birds speeds in mtrs/sec is 'x' and '2x' .
While flying from Engine to end, relative speed = (x+10) m/sec
from end to engine, flying speed = (2x - 10) mtr/sec
so
1000/(x+10) + 1000/(2x-10) = 187.5 secs
solving it, we get
so x = 8.728 m/sec and 2x= 17.456 m/sec

x = 31.4208 km/hr and 2x = 62.8416 km/hr.

Report Error

View Answer Report Error Discuss

Filed Under: Problems on Trains
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Bank Clerk , Bank PO

11 10142
Q:

Which among the following is a folk dance of India?

A) Garba B) Kathakali
C) Manipuri D) Mohiniattam
 
Answer & Explanation Answer: A) Garba

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Culture
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

61 10139
Q:

1747 + 13212 - ? = 1123

A) 16 B) 17
C) 18 D) 19
 
Answer & Explanation Answer: D) 19

Explanation:

1747 + 13212 - ? = 1123

1237 + 15812 - ? = 353

=> ? = 1237 + 15812 - 353

=> ? = 1476 + 1106 - 98084

=> ? = 19.07

Report Error

View Answer Report Error Discuss

Filed Under: Simplification
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

13 10138
Q:

What occurs during the digestion of protein?

A) Specific hormones breakdown proteins into simple sugars B) Specific enzymes breakdown proteins into simple sugars
C) Specific hormones breakdown proteins into complex starches D) Specific enzymes breakdown proteins into amino acids
 
Answer & Explanation Answer: D) Specific enzymes breakdown proteins into amino acids

Explanation:

Protein digestion occurs in the stomach and duodenum in which 3 main enzymes:

 

1. Pepsin secreted by the stomach 

2. Trypsin and

3. Chymotrypsin secreted by the pancreas

 

Break down food proteins into polypeptides that are then broken down by various exopeptidases and dipeptidases into amino acids.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 10136
Q:

A is 50% more efficient than B. They together start the work and 7/12th of work is left after 8 days. Find in what time B alone will complete the whole work.

A) 36 days  B) 44 days 
C) 50 days  D) 40 days 
 
Answer & Explanation Answer:

Explanation:

Ratio of efficiency of A to B is 3 : 2

Let, In 8 days they complete = (3 + 2) × 8 = 40 units

So, total work = 40 × 12/5 units

Time taken by B alone to complete whole work = 40 ×  12/5 ×2 = 48 days 

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: AIEEE , Bank Exams , CAT

5 10135