GATE Questions

Q:

The enzyme that is necessary to bring about clotting of blood is 

A) peptidase B) amylase
C) lipase D) thrombokinase
 
Answer & Explanation Answer: D) thrombokinase

Explanation:

The clotting of blood is a chain reaction initiated by the enzyme thrombokinase produced by the platelets. This causes prothrombin to be converted into thrombin in the presence of Ca++ion.

Thrombin combines with fibrinogen  to produce fibrin threads which entangles the corpuscles to form the clot.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , GATE

8 4868
Q:

Which best describes how air moves during convection?

A) cool air falls down B) warm air falls down
C) cool air is replaced by warm air D) air always falls down
 
Answer & Explanation Answer: A) cool air falls down

Explanation:

During convection, cool and dense air falls through the warmer and less dense air. The warm air having less mass is being displaced by the cooler which is much heavy. Convection always involves the air rising through the atmosphere.

 

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 4866
Q:

Train A, travelling at 84 kmph, overtook train B, traveling in the same direction, in 10 seconds. If train B had been traveling at twice its speed, then train A would have taken 22.5 seconds to overtake it. Find the length of train B, given that it is half the length of train A.

A) 180 m B) 100 m
C) 200 m D) 150 m
 
Answer & Explanation Answer:

Explanation:

Let speed of train B be x m/s And length of train B be y m
Then length of train A is 2y m
Speed of train A = 84 × 5/18 = 210/9 m/s = 70/3 m/s
A.T.Q, (2y+y)/10 = 70/3 − x .............(i)
and (2y+y)/ 22.5 = 70/3 − 2x ................(ii)
solving (i) and (ii), y = 50 m

Report Error

View Answer Report Error Discuss

0 4865
Q:

What does this symbol mean '&'?

A) Caret B) Bar
C) Ampersand D) Reversed Caret
 
Answer & Explanation Answer: C) Ampersand

Explanation:

'&' is a Logical Symbol and is called as Ampersand.

 

^ is called Caret

- is called Bar

v is called Reversed Caret.

Report Error

View Answer Report Error Discuss

Filed Under: Analytical Reasoning
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Analyst , Bank Clerk

17 4862
Q:

If J is the interest on K and K is the interest on L, the rate and time is the same on both the cases. What is the relation between J, K and L  ?

A) J x J = KL B) K x K= JL
C) L x L = JK D) JKL = 1
 
Answer & Explanation Answer: B) K x K= JL

Explanation:

Let the Time be 'N' and Rate be 'R' 

J = (K x NR)/100 K = (L x NR)/100 

J/K = NR/100 K/L = NR/100 

J/K = K/L 

K x K = JL

Report Error

View Answer Report Error Discuss

Filed Under: Simple Interest
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

8 4861
Q:

A group of five persons is formed from five boys and four girls. Find the probability that there are at least two girls in the group?

A) 110/129 B) 5/6
C) 121/126 D) 3/7
 
Answer & Explanation Answer: A) 110/129

Explanation:

Total number of possible ways = 

9C5 = 9 x 8 x 7 x 6 x 55 x 4 x 3 x 2 x 1 = 126

Number of favorable cases = 

4C2 x 5C3 + 4C3 x 5C2 + 4C4 x 5C14 x 32 x 1 x 5 x 4 x 33 x 2 x 1 + 4 x 3 x 23 x 2 x 1 x 5 x 4 2 x 1 + 1 x 5= 6 x 10 + 4 x 10 + 5= 60 + 40 + 5= 105

 

Therefore, required probability = 105/126 = 5/6

Report Error

View Answer Report Error Discuss

Filed Under: Probability
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

10 4859
Q:

K can lay Highway road between two cities in 16 days. L can do the same job in 12 days. With the help of M, they completes the job in 4 days. How much days does it take for M alone to complete the work ?

A) 47/7 days B) 59/6 days
C) 48/5 days D) 57/5 days
 
Answer & Explanation Answer: C) 48/5 days

Explanation:

Amount of work K can do in 1 day = 1/16

Amount of work L can do in 1 day = 1/12

Amount of work K, L and M can together do in 1 day = 1/4

Amount of work M can do in 1 day = 1/4 - (1/16 + 1/12) = 3/16 – 1/12 = 5/48

=> Hence M can do the job on 48/5 days = 9 (3/5) days  

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

9 4846
Q:

A caribbean shape that makes ships disappear

A) Square B) Triangle
C) Circle D) Pentagon
 
Answer & Explanation Answer: B) Triangle

Explanation:

The triangle is a caribbean shape that makes ships disappear.

 

A_caribbean_shape_that_makes_ships_disappear1558074852.jpg image

Report Error

View Answer Report Error Discuss

1 4845