Questions

Q:

Which statement regarding the mammalian heart is correct?

A) Blood is pumped from the heart via the atria. B) Oxygen-loaded blood moves only through the right side of the heart.
C) When the right atrium contracts, it forces blood into the left atrium. D) In the adult heart, blood in the right chambers of the heart cannot enter the left chambers without passing through the lungs.
 
Answer & Explanation Answer: D) In the adult heart, blood in the right chambers of the heart cannot enter the left chambers without passing through the lungs.

Explanation:

In the adult heart, blood in the right chambers of the heart cannot enter the left chambers without passing through the lungs is correct regarding mammalian heart.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

2 3235
Q:

What's the role of CMM Level in Testing?

Answer

Capability Maturity Model (CMM) is a model of 5 levels of process 'maturity' that determine effectiveness in delivering quality software. The 5 levels of CMM are described as below:


Level 1: Initial: - characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully complete projects. Very few or none of the processes are in place.


Level 2: Repeatable: - Software Project Tracking, Requirements Management, Realistic Planning and Configuration Management Processes are in place; successful practices can be repeated.


Level 3: Defined: - Standard Software Development and Maintenance Processes are integrated throughout an organization. A Software Engineering Process Group is in place to oversee software processes, and training programs are used to ensure understanding and compliance.


Level 4: Managed: - Metrics are used to track productivity, processes, and products. Project performance is predictable, and quality is consistently high.


Level 5: Optimizing: - The focus is on continuous process improvement. The impact of new processes and technologies can be predicted and effectively implemented when required.


Any organization can start from any level, but its motto is to reach level 5; where the focus is continuous process improvement. By doing this, high quality s/w delivery is assured.


From this, we can see that the whole essence of CMM or CMMI is to produce quality software. It targets the whole organizational practices (or processes), which are believed to be the best across industries. Testing is part of Quality Assurance. CMM levels play an important role in an organization’s Quality Assurance effort. Thus testing plays an important role in determining CMM level.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 3234
Q:

The most populous city in the world is  ?

A) Tokyo B) Paris
C) Peking D) London
 
Answer & Explanation Answer: A) Tokyo

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Famous Places
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

5 3234
Q:

Which is the only host team to win the ICC(50 over) Cricket World Cup

A) South Africa B) India
C) Australia D) West Indies
 
Answer & Explanation Answer: B) India

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Sports

3 3234
Q:

What does destination scan mean?

A) The shipment has arrived at a UPS facility. B) The shipment has departed a UPS facility and is on its way to the next UPS facility.
C) The shipment has arrived at the local UPS facility responsible for final delivery. D) UPS has received the shipment.
 
Answer & Explanation Answer: C) The shipment has arrived at the local UPS facility responsible for final delivery.

Explanation:

Shipment movement information is captured each time a tracking label is scanned in the UPS delivery system. There may be several days between scans if the shipment is going cross-country or moving between countries.

 

Destination Scan: The shipment has arrived at the local UPS facility responsible for final delivery.

Arrival Scan: The shipment has arrived at a UPS facility.

Departure Scan: The shipment has departed a UPS facility and is on its way to the next UPS facility.

Origin Scan: UPS has received the shipment.

Report Error

View Answer Report Error Discuss

Filed Under: Marketing and Sales

0 3233
Q:

" World Tuberculosis Day " is observed on ?

A) 24th March B) 22nd March
C) 23rd March D) 21st March
 
Answer & Explanation Answer: A) 24th March

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Important Days and Years
Exam Prep: Bank Exams , CAT
Job Role: Bank PO

3 3233
Q:

Carbon in the ocean originates from the atmosphere.

A) TRUE B) FALSE
Answer & Explanation Answer: A) TRUE

Explanation:

True, the given statement that Carbon in the ocean originates from the atmosphere is absolutely correct. Carbondi oxide in the atmosphere is absobed by the ocean surface and is dissolved as inorganic carbon in the oceans.

Report Error

View Answer Workspace Report Error Discuss

Subject: General Science
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

0 3231
Q:

Golden Temple of Amritsar is located in which country?

A) Bangladesh B) Pakistan
C) China D) India
 
Answer & Explanation Answer: D) India

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Famous Places

3 3229