Database Administration Questions


Q:

Three men, four women and six children can complete a work in 9 days. A women does  double the work a man does and a child does half the work a man does. How many women alone can complete this work in 9 days?

A) 7 B) 8
C) 9 D) 6
 
Answer & Explanation Answer: A) 7

Explanation:

Given (3 Men + 4 Women + 6 Children) -----> 9 days

But W = 2M and C = M/2

Now, convert Men and Children into Women by

3W2 + 4W + 6W4=> 32 + 4 + 32 = 7 Women 

Therefore, 7 women alone can complete this work in 9 days.

Report Error

View Answer Report Error Discuss

12 7343
Q:

Two trains are running with speeds 30 kmph and 58 kmph respectively in the same direction. A man in the slower train passes the faster train in 18 seconds. Find the length of the faster train?

A) 105 mts B) 115 mts
C) 120 mts D) 140 mts
 
Answer & Explanation Answer: D) 140 mts

Explanation:

Speeds of two trains = 30 kmph and 58 kmph

=> Relative speed = 58 - 30 = 28 kmph = 28 x 5/18 m/s = 70/9 m/s

Given a man takes time to cross length of faster train = 18 sec

 

Now, required Length of faster train = speed x time = 70/9  x  18 = 140 mts.

Report Error

View Answer Report Error Discuss

3 7328
Q:

3 is what percent of 5?

A) 45% B) 60%
C) 72% D) 80%
 
Answer & Explanation Answer: B) 60%

Explanation:

Here it is asked that 3 is what percent of 5

Let 3 is K percent of 5.

=> K x 5/100 = 3

=> K = 300/5 = 60

 

Hence, 3 is 60% of 5.

Report Error

View Answer Report Error Discuss

8 7308
Q:

White Box Techniques are also called as

A) Design Based Testing B) Experience Based Technique
C) Structural Testing D) Error Guessing Technique
 
Answer & Explanation Answer: C) Structural Testing

Explanation:

Structural Testing is the other name for White Box Techniques.

Report Error

View Answer Report Error Discuss

0 7273
Q:

In a worksheet, you can select

A) Only rows B) Only columns
C) Entire worksheet D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:

A worksheet or sheet is a collection of cells in a file created with an electronic spreadsheet program such as Microsoft Excel or Google Sheets where we can keep and save data.

 

in_a_worksheet_you_can_select1557727086.jpg image

 

Here in a worksheet, we can select a single row or column or multiple rows or columns or we can select the entire worksheet. We can create multiple worksheets in a workbook.

Report Error

View Answer Report Error Discuss

7 7264
Q:

In OSI network architecture, the routing is performed by

A) transport layer B) session layer
C) network layer D) data link layer
 
Answer & Explanation Answer: C) network layer

Explanation:

in_osi_network_architecture_the_routing_is_performed_by1553604163.jpg image

 

In networking, the Open Systems Interconnection is commonly called as OSI model. It has a 7 layer architecture for the communication.

 

In OSI network architecture, the routing is performed by network layer which is layer number 3 with the help of intermediate routers.

Report Error

View Answer Report Error Discuss

4 7151
Q:

A term used interchangeably with diskette is

A) Floppy disk B) Disk pack
C) Disk cartridge D) Packette disk
 
Answer & Explanation Answer: A) Floppy disk

Explanation:

A term used interchangeably with diskette is Floppy disk.

Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: AIEEE , Bank Exams , CAT , GRE , TOEFL
Job Role: Analyst , Bank Clerk , Bank PO , Database Administration , IT Trainer

5 7099
Q:

Out of three numbers, the first is twice the second and is half of the third. If the average of the three numbers is 56, what will be the sum of the highest number and the lowest number?

A) 120 B) 160
C) 80 D) 60
 
Answer & Explanation Answer: A) 120

Explanation:

Let the three numbers be x, y, z.

From the gien data,

x = 2y ....(1)

x = z/2 => z = 2(2y) = 4y .....(From 1)  ...........(2)

Given average of three numbers = 56

Then,

 

x + y + z3 = 562y + y + 4y3 = 56  (From 1 & 2)7y = 56 x 3y = 24

Now,

x = 2y => x = 2 x 24 = 48

z = 4y = 4 x 24 = 96

 

Now, the highest number is z = 96 & smallest number is y = 24

 

Hence, required sum of highest number and smallest number

= z + y

= 96 + 24

= 120.

Report Error

View Answer Report Error Discuss

Filed Under: Average
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , Database Administration , IT Trainer

15 7085