GATE Questions

Q:

If M $ N means M is the brother of N; M # N means M is the mother of N; M * N means M is the daughter of N. Then in I # J $ K * L, who is the father ?

A) L B) K
C) J D) I
 
Answer & Explanation Answer: A) L

Explanation:

I is the mother of J, J is the brother of K and K is the daughter of L. Hence , L is the Father.

Report Error

View Answer Report Error Discuss

Filed Under: Blood Relations
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

16 10129
Q:

Which component of an IED creates an electrical charge?

A) activator B) fuse
C) explosive D) power source
 
Answer & Explanation Answer: D) power source

Explanation:

The power source such as a Battery of an IED creates an electrical charge.

 

What are IED's ::

An Improvised Explosive Device (IED) is a bomb constructed and deployed in ways other than in conventional military action. It may be constructed of conventional military explosives, such as an artillery shell, attached to a detonating mechanism. IEDs are commonly used as roadside bombs.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

10 10114
Q:

A drink vendor has 368 liters of Maaza, 80 liters of Pepsi and 144 liters of Sprite. He wants to pack them in cans, so that each can contains the same number of liters of a drink, and doesn't want to mix any two drinks in a can. What is the least number of cans required ?

A) 47 B) 46
C) 37 D) 35
 
Answer & Explanation Answer: C) 37

Explanation:

The number of liters in each can = HCF of 80, 144 and 368 = 16 liters.
Number of cans of Maaza = 368/16 = 23
Number of cans of Pepsi = 80/16 = 5
Number of cans of Sprite = 144/16 = 9
The total number of cans required = 23 + 5 + 9 = 37 cans.

Report Error

View Answer Report Error Discuss

Filed Under: HCF and LCM
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

31 10111
Q:

Orlon is a polymer of

A) Dacron B) Acrylonitrile
C) Polyamide Nylon D) None of the above
 
Answer & Explanation Answer: B) Acrylonitrile

Explanation:

The monomeric unit of orlon polymer is Acrylonitrile. Orlon is also known as Polyacrylonitrile (PAN). 

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

19 10101
Q:

Pageant is most similar in meaning to

A) Show B) Gallant
C) Beauty D) Sovereign
 
Answer & Explanation Answer: A) Show

Explanation:

Pageant is most similar in meaning to Show.

Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE , TOEFL
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

0 10094
Q:

An Engine length 1000 m moving at 10 m/s. A bird is flying from engine to end with 'x' m/s and coming back at '2x' m/s. Take total time of bird travelling as 187.5 s. Find x and 2x in km/hr ?

A) 21.4 and 42.8 B) 25.2 and 50.4
C) 31.4208 and 62.8416 D) 33.12 and 66.24
 
Answer & Explanation Answer: C) 31.4208 and 62.8416

Explanation:

Birds speeds in mtrs/sec is 'x' and '2x' .
While flying from Engine to end, relative speed = (x+10) m/sec
from end to engine, flying speed = (2x - 10) mtr/sec
so
1000/(x+10) + 1000/(2x-10) = 187.5 secs
solving it, we get
so x = 8.728 m/sec and 2x= 17.456 m/sec

x = 31.4208 km/hr and 2x = 62.8416 km/hr.

Report Error

View Answer Report Error Discuss

Filed Under: Problems on Trains
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Bank Clerk , Bank PO

11 10059
Q:

Running 3/4th of his usual rate, a man is 15min late. Find his usual time in hours  ?

A) 2/3 hrs B) 3/4 hrs
C) 1/3 hrs D) 1/4 hrs
 
Answer & Explanation Answer: B) 3/4 hrs

Explanation:

Walking at 3/4th of usual rate implies that time taken would be 4/3th of the usual time. In other words, the time taken is 1/3rd more than his usual time

 

so 1/3rd of the usual time = 15min
or usual time = 3 x 15 = 45min = 45/60 hrs = 3/4 hrs.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Distance
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

5 10056
Q:

X can complete the work in 10 days, Y can do the same in 15 days. If they are hired for 5 days to do the work together, what is the work that left unfinished?

A) 1/3 B) 2/3
C) 1/6 D) 5/6
 
Answer & Explanation Answer: C) 1/6

Explanation:

Given X can do in 10 days 

=> 1 day work of X = 1/10

 

Y can do in 15 days 

=> 1 day work of Y = 1/15

 

1day work of (X + Y) = 1/10 + 1/15 = 1/6

 

Given they are hired for 5 days

 => 5 days work of (X + Y) = 5 x 1/6 = 5/6

 Therefore, Unfinished work = 1 - 5/6 = 1/6 

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

11 10039