Certification Questions

Q:

Which Event Viewer log can you use to view the results of auditing?

A) Application Log B) Security Log
C) System Log D) Directory Service Log
 
Answer & Explanation Answer: B) Security Log

Explanation:

Audited events are written to the Security Log in Event Viewer.

Report Error

View Answer Report Error Discuss

0 2219
Q:

Identify the fields in the Data Link portion of an Ethernet frame?

Answer

The fields in the Data Link portion of a frame include the Preamble, Start Frame Delimiter, Destination MAC address, Source MAC address, Length or Type, Data, and Frame Check Sequence.

Report Error

View answer Workspace Report Error Discuss

Subject: CCNA

0 2217
Q:

The status bar of Word 2010 provides useful information about the current document you are working on. You can customize the status bar to add or remove options to suit your needs. By default, which of these options is NOT present on the status bar?

A) Line Number B) Page Number
C) Word Count D) Language
 
Answer & Explanation Answer: A) Line Number

Explanation:
Report Error

View Answer Report Error Discuss

1 2217
Q:

The Backstage View in Word 2010 presents an easy way to access all the tools you need to manage your documents. It helps prevent clutter on the main Word 2010 Ribbon and provides core file management functions. There are 6 tabs across the top of the Backstage View window, one of these is called Info. Which of these functions does Info contain?

A) Set user permissions for documents B) Know when a document was last printed
C) Run accessibility tests D) All of these
 
Answer & Explanation Answer: D) All of these

Explanation:
Report Error

View Answer Report Error Discuss

1 2216
Q:

You would like to use the command line to end an application that a Terminal Services client is running. What command can you use?

A) Tscon B) Tsprof
C) Tsend D) Tskill
 
Answer & Explanation Answer: D) Tskill

Explanation:

Tskill ends a process. Since you want to stop an application, this is the command you would use.

Report Error

View Answer Report Error Discuss

0 2215
Q:

When should a DSO be used?

A. When Data needs to be overwritten.

B. When highly granular data is required in reports

C. All of the above.

Answer

Answer : C

Report Error

View answer Workspace Report Error Discuss

Subject: SAP BW

1 2215
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Schedule Control ?

Answer

I. Inputs



  • Schedule management plan

  • Schedule baseline

  • Performance reports

  • Approved change requests


II. Tools and Techniques



  • Progress reporting

  • Schedule change control system

  • Performance measurement

  • Project management software

  • Variance analysis

  • Schedule comparision bar charts


III. Outputs



  • Schedule model data (updates)

  • Schedule baseline (updates)

  • Performance measurements

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Activity list (updates)

  • Activity attributes (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2205
Q:

Project Scope Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Scope control ?

Answer

I. Inputs



  • Project scope statement

  • Work breakdown structure

  • WBS dictionary

  • Project scope management plan

  • Performance reports

  • Approved change requests

  • Work performance information


II. Tools and Techniques



  • Change control system

  • Variance analysis

  • Replanning

  • Configuration management system


III. Outputs



  • Project scope statement(updates)

  • Work breakdown structure(updates)

  • WBS dictionary (updates)

  • Scope baseline (updates)

  • Requested changes

  • Recommended  corrective action

  • Organizational process assets (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2201