Questions

Q:

Secondary consumers are eaten by larger

A) fast animal B) animal in the third trophic level
C) herbivorous animal D) predator
 
Answer & Explanation Answer: D) predator

Explanation:

A tertiary consumer is an animal that obtains its nutrition by eating primary consumers and secondary consumers.

Usually tertiary consumers are carnivorous predators, although they may also be omnivores, which are animals that feed on both meat and plant material.

 

Tertiary consumers often occupy the top trophic level, and so are predated by no other animals; in this case they are called "apex predators". However, when they die their bodies will be consumed by scavengers and decomposers.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 3633
Q:

The process that takes place in the atom bomb is

A) nuclear fusion B) nuclear fission
C) radioactive disintegration D) chemical decomposition
 
Answer & Explanation Answer: B) nuclear fission

Explanation:

In the atom bomb, isotopes of uranium are  disintegrated with the release of a large amount of energy. Hence, the process is nuclear fission.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry

1 3632
Q:

The primary effect on climate of a volcanic eruption depends on______

A) the quantity of lava produced B) how hot the eruptive products are
C) the amount of water vapour produced D) none of the above
 
Answer & Explanation Answer: D) none of the above

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World Geography

2 3632
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3632
Q:

You are a project manager for the redevelopment of the Hoover Dam. Your team has been provided with the scope statement, but it lacks many description details. Your team is concerned because the project is in the initiation phase and it wants to postpone it until it has more information. As the project manager, you recommend that

A) The team should go forward, but be caution about the lack of details and the impact upon the timeline for the project B) The project should not go forward until the stakeholders agree about the scope and purpose of the project
C) The team should verify the scope and realize that more details will be available as more project characteristics are progressively elaborated. D) The team should review the project selection criteria for the Hoover Dam project
 
Answer & Explanation Answer: C) The team should verify the scope and realize that more details will be available as more project characteristics are progressively elaborated.

Explanation:

The project details and description will usually have less detail at the beginning of the project and will increase as the characteristics are progressively elaborated. Answer A is incorrect because the team should confirm that they understand the esence of the scope of the project, even if the details might be ambiguous at the beginning of the project. Answer B is incorrect because the project should go forward; however, the team should request further clarification of what the project scope entails. Answer D is incorrect because the project selection criteria should be established before the project begins.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3631
Q:

Which of the following is regarded by historians as a crucial stage in describing the progress of civilization?

A) Writing B) The discovery of fire
C) Agriculture D) The use of internet
 
Answer & Explanation Answer: C) Agriculture

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian History

3 3630
Q:

Which batsman has scored the most Test Hundreds ever?

A) Steve Waugh B) Sachin Tendulkar
C) Rahul Dravid D) Sunil Gavaskar
 
Answer & Explanation Answer: B) Sachin Tendulkar

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Sports

7 3630
Q:

Which of the following is an example of continous emission spectrum?

A) Spectrum of an oil frame B) Spectrum of a water
C) both D) none
 
Answer & Explanation Answer: A) Spectrum of an oil frame

Explanation:

Spectrum of an oil frame is an example for continuous emission spectrum

Report Error

View Answer Report Error Discuss

Filed Under: Physics

3 3630