IT Trainer Questions


Q:

If a soldier fires 7 shots from a gun in 12 minutes then find the total number of shots fired by the man in 3/2 hrs.

A) 45 B) 44
C) 46 D) 47
 
Answer & Explanation Answer: C) 46

Explanation:

Here given soldier shots 7 shots in 12 min

=> 1 shot doen't take any time in 12 min 

=> Only 6 shots take 12 min 

12 min ------ 6 shots 

90 min ------ ? shots 

=> 90 x (6/12) = 45 

Therefore, total shots fired in 90 minutes = 45 + 1 = 46 shots.

Report Error

View Answer Report Error Discuss

11 8300
Q:

What does one mole of H2O correspond to

A) 16 gms B) 18 gms
C) 20 gms D) 22 gms
 
Answer & Explanation Answer: B) 18 gms

Explanation:

The molar mass of H2O can be calculated as the following.

M(H2O)= [2 x M(H)] + [M(O)].

And we know that M(H) = 1g/mol, M(O) = 16g/mol.

So, M(H2O)= 2x1 + 16 = 18g/mol,

That means 1 mole of H2O contains 18g.

 

Hence, one mole of H2O corresponds to 18 grams.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

6 8230
Q:

How many balls?

Number of balls in the figure...

balls1523099634.jpg image

Answer

You have to actually count all the balls in the pyramid.
Simple way is to count the balls in each level.


So lower most level lets say 1st level has 4 x 4 balls; i.e. 16 balls
Similarly 2nd level has 3 x 3 balls; i.e. 9 balls.
3rd level has 2 x 2 balls; i.e. 4 balls.
The top most level has just 1 ball.


So the total number of balls is 16+9+4+1 = 30.


 


So the image has 30 Balls in all.

Report Error

View answer Workspace Report Error Discuss

11 8177
Q:

What does Maturation refers to

Answer

Maturation refers to the ways in which we grow and develop throughout the lifespan.


 





      •  Maturation is the process of becoming mature; the emergence of individual and behavioral characteristics through growth processes over time.



Report Error

View answer Workspace Report Error Discuss

55 8171
Q:

How to call a constructor in java?

Answer

Constructor chaining is the process of calling one constructor from another constructor with respect to current object.





Within same class: It can be done using this() keyword for constructors in same class


From base class: by using super() keyword to call constructor from the base class.

Report Error

View answer Workspace Report Error Discuss

10 8145
Q:

What is an Extension of Entity Type?

Answer

The collections of entities of a particular Entity Type are grouped together into an entity set.

Report Error

View answer Workspace Report Error Discuss

26 8096
Q:

Kilohertz is a unit which measures

A) Electromagnetic radio wave frequencies B) Electric resistance
C) Power used by a current of one ampere D) Voltage
 
Answer & Explanation Answer: A) Electromagnetic radio wave frequencies

Explanation:

The hertz (Hz) is defined as one cycle per second and is a SI unit of frequency. Here kilohertz is also a unit of frequency of waves and is defined as 1000 cycles per second. Radio waves are measured in kilohertz (KHz).

 

Kilohertz_is_a_unit_which_measures1561453991.jpg image

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , Database Administration , IT Trainer

6 8070
Q:

A, B and C can do a piece of work in 72, 48 and 36 days respectively. For first p/2 days, A & B work together and for next ((p+6))/3days all three worked together. Remaining 125/3% of work is completed by D in 10 days. If C & D worked together for p day then, what portion of work will be remained?

A) 1/5 B) 1/6
C) 1/7 D) 1/8
 
Answer & Explanation Answer: B) 1/6

Explanation:

Total work is given by L.C.M of 72, 48, 36

Total work = 144 units

Efficieny of A = 144/72 = 2 units/day

Efficieny of B = 144/48 = 3 units/day

Efficieny of C = 144/36 = 4 units/day

 

According to the given data,

2 x p/2 + 3 x p/2 + 2 x (p+6)/3 + 3 x (p+6)/3 + 4 x (p+6)/3 = 144 x (100 - 125/3) x 1/100

3p + 4.5p + 2p + 3p + 4p = 84 x 3 - 54

p = 198/16.5

p = 12 days.

 

Now, efficency of D = (144 x 125/3 x 1/100)/10 = 6 unit/day

(C+D) in p days = (4 + 6) x 12 = 120 unit

Remained part of work = (144-120)/144 = 1/6.

Report Error

View Answer Report Error Discuss

7 8040