Q:

What is the maximum number of IP addresses that can be assigned to hosts on a local subnet that uses the 255.255.255.224 subnet mask?

A) 15 B) 16
C) 30 D) 31
 
Answer & Explanation Answer: C) 30

Explanation:

A/27 (255.255.255.224) is 3 bits on and 5 bits off. This provides 8 subnets, each with 30 hosts. Does it matter if this mask is used with a Class A, B, or C network address? Not at all. The number of host bits would never change.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 3267
Q:

A Good CFO will tell you that it is important to look at your bottom line and determine how to increase profits for the organization. Veronica, the new CFO at a local university, is taking that approach and applying it to new projects. Therefore,she wants to include costs from each phase of the project on a total expenditure is known as 

A) An opportunity cost B) A sunk cost
C) NPV D) A life cycle
 
Answer & Explanation Answer: D) A life cycle

Explanation:

Life Cycle costing includes the costs from each phase of the project life cycle when the total investment costs are calculated. Answer A is incorrect because an opportunity cost is the difference between a chosen investment and the one that is passed up. Answer B is incorrect because sunk costs are costs that have been incurred and cannot be reversed. Answer C is incorrect because net present value (NPV) is the present value of cash inflows(benifits) minus the present value of cash outflows (costs).

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3260
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Control ?

Answer

I. Inputs



  • Cost baseline

  • Project funding requirements

  • performance reports

  • Work performance information

  • Approved change requests

  • Project management plan


II. Tools and Techniques



  • Cost change control system

  • Performance measurement analysis

  • Forecasting

  • Project performance reviews

  • Project management software 

  • Variance management


III. Outputs



  • Cost estimate (updates)

  • Cost baseline (updates)

  • Performance measurements

  • Forecasted completion

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Project management plan (updates)


 

Report Error

View answer Workspace Report Error Discuss

0 3252
Q:

A network administrator views the output from the show ip route command. A network that is advertised by both RIP and EIGRP appears in the routing table flagged as an EIGRP route. why is the RIP route to this network not used in the routing table?

A) EIGRP has a faster update timer B) EIGRP has a lower administrative distance
C) RIP has a higher metric for that route D) The RIP path has a routing loop
 
Answer & Explanation Answer: B) EIGRP has a lower administrative distance

Explanation:

RIP has an administrative distance (AD) of 120, while EIGRP has an administrative distance of 90, so the router will discard any route with a higher AD than 90 to that same network.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

1 3248
Q:

Criteria for selecting PSA and IDOC methods for Data Transfer

A. Load performance.
B. Query performance.
C. Volume of Data.

Answer

Answer : C

Report Error

View answer Workspace Report Error Discuss

Subject: SAP BW

2 3246
Q:

Project Procurement Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Contract Administration?

Answer

I. Inputs



  • Contract

  • Contract management plan

  • Selected sellers

  • Performance reports

  • Approved change requests

  • Work performance information


II. Tools and Techniques



  • Contract change control system

  • Buyer-conducted performance review

  • Inspections and audits

  • Performance reporting

  • Payment system

  • Claims administration

  • Records management system

  • Information technology


III. Outputs



  • Contract documentation 

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Project management plan (updates)


                 - Procurement management plan


                 - Contract management plan

Report Error

View answer Workspace Report Error Discuss

0 3242
Q:

Project Management - Introduction

What is Project Management Office?

Answer

A Project Management office (PMO) is an organizational unit to centralize and coordinate the management of projects under its domain. A PMO can also be reffered to as a "program management office", "Project office", or "Program office". A PMO oversees the management of projects, programs, or a combination of both.


PMOs can operate on a continuum, from providing project management support functions in the form of training, software, standardized policies, and procedures, to actual direct management and responsibility for achieving the project objectives.

Report Error

View answer Workspace Report Error Discuss

0 3237
Q:

It is possible to post down payment  on an Asset Under Construction

A) TRUE B) FALSE
Answer & Explanation Answer: A) TRUE

Explanation:
Report Error

View Answer Workspace Report Error Discuss

Subject: SAP FI