Q:

Project Scope Management

What are the Project Management Processes included in the Project Scope Management?

Answer

Scope Planning - Creating a project scope management plan that documents how the project scope will be defined,verified, controlled, and how the work breakdown structure (WBS) will be created and defined.


Scope Definition - Developing a detailed project scope statement as the basis for future project decisions.


Create WBS - Subdividing the major project deliverables and project work into smaller, more manageable components


Scope Verification - Formalizing acceptance of the completed project deliverables.


Scope Control - Controlling changes to the project scope.

Report Error

View answer Workspace Report Error Discuss

0 2226
Q:

You want to configure a static IP address on a Windows 2000 Server  computer on which you want to install the DNS Server service and Active Directory. What tool should you use to configure the static IP address?

A) IPconfig.exe B) DNS administrative tool
C) Active Directory Users and Computers D) Network and Dial-up connections folder
 
Answer & Explanation Answer: D) Network and Dial-up connections folder

Explanation:

A static IP address is specified by configuring the Local Area Connection in the Network and Dial - up Connections folder.

Report Error

View Answer Report Error Discuss

0 2225
Q:

For most large companies, in terms of ease of network administration, what is the optimum number of Active Directory domains to use on their Windows 2000 network?

A) 1 B) 2
C) 3 D) More than 3
 
Answer & Explanation Answer: A) 1

Explanation:

Using a single domain greatly simplifies the administration of your network

Report Error

View Answer Report Error Discuss

0 2225
Q:

Which Cisco 802.1d extension stops BPDU from being transmitted out a port?

Answer

PortFast

Report Error

View answer Workspace Report Error Discuss

Subject: CCNA

0 2225
Q:

Individual calcualtion methods which can be assigned to Depreciation key.

A. Declining balance methods
B. Maximum amounts methods
C. Multilevel methods
D. Period control Methods

Answer

Answer : A ,B , C ,D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP FI

0 2223
Q:

In the case of the valuation of time wage types, if the RTE or AMT field contains an amount, the wage type is transferred to the internal table...

A. RF.

B. OT.

C. KX.

D. CT.

Answer

Answer : B

Report Error

View answer Workspace Report Error Discuss

Subject: SAP HR

0 2221
Q:

Project Human Resource Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Human Resource Planning?

Answer

I. Inputs



  • Enterprise Environmental factors

  • Organizational process assets

  • Project management plan


                  - Activity resource requirements


II. Tools and Techniques



  • Organization charts and position descriptions 

  • Networking

  • Organizational theory


III. Outputs



  • Roles and responsibilities

  • Project organization charts

  • Staffing management plan

Report Error

View answer Workspace Report Error Discuss

0 2220
Q:

Which tab should you use to change the page orientation of a report?

A. Select the report tab; in Report Manager, select the Properties tab and select the Page Orientation

B. Click File Page Setup and select Page Orientation

C. In InfoView Preferences, change the default page orientation

D. Select the report page; in Report Manager, select the Properties tab and select the Page Orientation

Answer

Answer : D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP BW

7 2220