Certification Questions

Q:

The Backstage View in Word 2010 presents an easy way to access all the tools you need to manage your documents. It helps prevent clutter on the main Word 2010 Ribbon and provides core file management functions. There are 6 tabs across the top of the Backstage View window, one of these is called Info. Which of these functions does Info contain?

A) Set user permissions for documents B) Know when a document was last printed
C) Run accessibility tests D) All of these
 
Answer & Explanation Answer: D) All of these

Explanation:
Report Error

View Answer Report Error Discuss

1 2255
Q:

You want to configure a static IP address on a Windows 2000 Server  computer on which you want to install the DNS Server service and Active Directory. What tool should you use to configure the static IP address?

A) IPconfig.exe B) DNS administrative tool
C) Active Directory Users and Computers D) Network and Dial-up connections folder
 
Answer & Explanation Answer: D) Network and Dial-up connections folder

Explanation:

A static IP address is specified by configuring the Local Area Connection in the Network and Dial - up Connections folder.

Report Error

View Answer Report Error Discuss

0 2253
Q:

Which tab should you use to change the page orientation of a report?

A. Select the report tab; in Report Manager, select the Properties tab and select the Page Orientation

B. Click File Page Setup and select Page Orientation

C. In InfoView Preferences, change the default page orientation

D. Select the report page; in Report Manager, select the Properties tab and select the Page Orientation

Answer

Answer : D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP BW

7 2247
Q:

For materials that require batch control, the batch number can be specified in:

A. The billing document.

B. The picking overview screen.

C. At post goods issue.

D. The sales order line item.

Answer

Answer : B , C , D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP SD

0 2247
Q:

You would like to use the command line to end an application that a Terminal Services client is running. What command can you use?

A) Tscon B) Tsprof
C) Tsend D) Tskill
 
Answer & Explanation Answer: D) Tskill

Explanation:

Tskill ends a process. Since you want to stop an application, this is the command you would use.

Report Error

View Answer Report Error Discuss

0 2244
Q:

Which Event Viewer log can you use to view the results of auditing?

A) Application Log B) Security Log
C) System Log D) Directory Service Log
 
Answer & Explanation Answer: B) Security Log

Explanation:

Audited events are written to the Security Log in Event Viewer.

Report Error

View Answer Report Error Discuss

0 2243
Q:

Project Quality Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Perform Quality Control?

Answer

I. Inputs



  • Quality management plan

  • Quality metrics 

  • Quality checklists

  • Organizational process assets

  • Work performance information

  • Approved change requests

  • Deliverables


II. Tools and Techniques



  • Cause and effect diagram

  • Control charts

  • Flow Charting

  • Histogram

  • Pareto chart

  • Run chart

  • Scatter diagram

  • Statistical sampling

  • Inspection

  • Defect repair review


III. Outputs



  • Quality control measurements

  • Validated defect repair

  • Quality baseline (updates)

  • Recommended corrective actions

  • Recommended preventive actions

  • Requested changes

  • Recommended defect repair

  • Organization process assets (updates)

  • Validated deliverables

  • Project management plan (updates)


 


 

Report Error

View answer Workspace Report Error Discuss

0 2243
Q:

Project Scope Management

What are the Project Management Processes included in the Project Scope Management?

Answer

Scope Planning - Creating a project scope management plan that documents how the project scope will be defined,verified, controlled, and how the work breakdown structure (WBS) will be created and defined.


Scope Definition - Developing a detailed project scope statement as the basis for future project decisions.


Create WBS - Subdividing the major project deliverables and project work into smaller, more manageable components


Scope Verification - Formalizing acceptance of the completed project deliverables.


Scope Control - Controlling changes to the project scope.