Certification Questions

Q:

You are a developer for a XYZ Inc that provides free software over the Internet. You are developing en e-mail application that users all over the world can download.

 

The application displays text strings in the user interface. At run time, these text strings must appear in the language that is appropriate to the locale setting of the computer running the application.

 

You have resources to develop versions of the application for only four different cultures.You must ensure that your application will also be usable by people of other cultures.
How should you prepare the application for deployment?

A) Package a different assembly for each culture. B) Package a different executable file for each culture.
C) Package a main assembly for source code and the default culture. Package satellite assemblies for the other cultures. D) Package a main assembly for source code. Package satellite assemblies for each culture.
 
Answer & Explanation Answer: C) Package a main assembly for source code and the default culture. Package satellite assemblies for the other cultures.

Explanation:

When you build a project, the resource files are compiled and then embedded in satellite assemblies, or assemblies which contain only the localized resources. The fallback resources are built into the main assembly, which also contains the application code.

Report Error

View Answer Report Error Discuss

1 2636
Q:

What are the purposes of areas in an OSPF network?

Answer

Areas allow the design of a hierarchical network. Routes can be summarized or blocked in an area to reduce the amount of routing information on internal OSPF routers.

Report Error

View answer Workspace Report Error Discuss

Subject: CCNP

2 2636
Q:

Which command would you use to apply an access list to a router interface?

A) ip access - list 101 out B) acces - list ip 101 in
C) ip access - group 101 in D) access - group ip 101 in
 
Answer & Explanation Answer: C) ip access - group 101 in

Explanation:

To apply an access list , the proper command is ip access - group 101 in.

Report Error

View Answer Report Error Discuss

Filed Under: CCNA

0 2624
Q:

4 phases of project management are

Answer

The project management life cycle describes high-level processes for delivering a successful project.


The project management life cycle is usually broken down into four phases:


1. Initiation and Planning,


2. Execution,


3. Project Monitoring and Control, and


4. Project Closing.

Report Error

View answer Workspace Report Error Discuss

11 2618
Q:

Which of the following is primary wage type ?

A. User Wage Type

B. Dialog Wage Type

C. Technical Wage Type

D. Statement Wage Type

Answer

Answer : B

Report Error

View answer Workspace Report Error Discuss

Subject: SAP HR

0 2604
Q:

You are upgrading your single master Windows NT Server 4.0 network to Windows 2000. Which computer should you upgrade first?

A) The stand-alone server in the Windows NT 4.0 domain that will become the root domain in your Windows 2000 network B) The primary domain controller (PDC) in the Windows NT 4.0 domain that will become a child domain in your Windows 2000 network
C) The backup domain controller (BDC) in the Windows NT 4.0 domain that will become a child domain in your Windows 2000 network D) The Primary domain controller (PDC) in the Windows NT 4.0 domain that will become the root domain in your Windows 2000 network
 
Answer & Explanation Answer: D) The Primary domain controller (PDC) in the Windows NT 4.0 domain that will become the root domain in your Windows 2000 network

Explanation:

When upgrading from a Windows NT 4.0 single master domain model to windows 2000, the first computer you should upgrade is the PDC of the Windows NT 4.0 domain that will become the root domain of your Windows 2000 network.

Report Error

View Answer Report Error Discuss

0 2600
Q:

When setting up a Google AdWords Account, why should you choose your currency and time zone carefully?

Answer

These can not be edited once the account is set up.

Report Error

View answer Workspace Report Error Discuss

0 2597
Q:

Project Quality Management

What are the Project Management Processes included in the Project Quality Management?

Answer

Quality planning - Identifying which quality standards are relevant to the project and determining how to satisfy them


Perform Quality Assurance - Applying the planned , systematic quality activities to ensure that the project employs all processes needed to meet requirements.


Perform Quality Control - monitoring specific project results to determine whether they comply with relevant quality standards and identifying ways to eliminate causes of unsatisfactory performance.

Report Error

View answer Workspace Report Error Discuss

0 2596